• 太坏了!傅欢遇“断子绝孙腿” 这动作红牌都不冤 2019-04-17
  • 市民工地发现并机智"抢回" 4件圆明园流散文物终"回家" 2019-04-17
  • 世界杯成中国企业营销升级大战场 2019-04-15
  • 中东部地区将有强降雨 京津冀等地有轻至中度霾 2019-04-11
  • 郑永年:新时代的清醒判断 2019-04-11
  • 让协商民主优势得以充分发挥 2019-04-10
  • 网友给太原市市长留言获回复 共计11条 2019-04-09
  • 尧都区车站街建设社区老党员高德宏同志手抄“党章”庆党生 2019-04-09
  • 正心正念 爱国爱教 佛界楷模 2019-04-02
  • 防治土地荒漠化 新疆保护生态兼顾农民增收 2019-04-02
  • 许倬云作序《现代的历程》:现代人的天问 2019-03-31
  • 证监会:首发审核政策始终没有变化 2019-03-31
  • 2008年全球金融危机之后,为什么金融危机发源地的美国,欧债危机重灾区的欧洲各国股市连续7年走牛,屡创历史新高,唯经济最好的中国股市却连续7年熊冠全球?去年中国 2018-11-17
  • 完成自己的第一部电影, 她23岁就做到了 2018-11-17
  • 时时彩组选软件:Facilities and Cost Engineering

    engineering-and-economics-banner.jpg

    后一万能码 2期内中 www.qgqx.net PREG has the ability to carry out Facilities Engineering in all the aspects for the value chain covering:

    • Exploration and Appraisal costs and scheduling
    • Development conception selection
    • Development planning scheduling
    • Development Cost estimation.

    In caring out this Facilities Engineering evaluation to Field Development Planning stage the following in incorporated

    • Identifying the strategic decision variable: Client / Shareholders; Reservoir fluid and processing; Field location and infrastructures; Delivery point; Productivity range; water depth, etc.
    • Key uncertainties: Reservoir fluid composition; Well productivity; Reserves; Data reliability; Formation parameters
    • Major constraints: Environmental and health issues; regulations
    • Subsea (wet tree) completions or Platforms? Onshore, Offshore processing or both? Pipelines: Multiphase or single phase
    • Field location, nearby fields (discoveries, producing, developed). A review gives better understanding of the likely field performance and challenges
    • Infrastructures. Is there any, can it be utilised and how is this best done
    • Environment, topography, situation. The has a significant impact on the constraints of any development
    • Reserves (in – place and recoverable). The driver for the size of the infrastructure.
    • Field Parameters (Fluid types, composition, pressure and Temperature). These items drive how complex or otherwise are the infrastructure and facilities

    The Facilities and Cost Engineer works closely with the sub surface team members as a large amount of their data is key to the development planning concept selection.

  • 太坏了!傅欢遇“断子绝孙腿” 这动作红牌都不冤 2019-04-17
  • 市民工地发现并机智"抢回" 4件圆明园流散文物终"回家" 2019-04-17
  • 世界杯成中国企业营销升级大战场 2019-04-15
  • 中东部地区将有强降雨 京津冀等地有轻至中度霾 2019-04-11
  • 郑永年:新时代的清醒判断 2019-04-11
  • 让协商民主优势得以充分发挥 2019-04-10
  • 网友给太原市市长留言获回复 共计11条 2019-04-09
  • 尧都区车站街建设社区老党员高德宏同志手抄“党章”庆党生 2019-04-09
  • 正心正念 爱国爱教 佛界楷模 2019-04-02
  • 防治土地荒漠化 新疆保护生态兼顾农民增收 2019-04-02
  • 许倬云作序《现代的历程》:现代人的天问 2019-03-31
  • 证监会:首发审核政策始终没有变化 2019-03-31
  • 2008年全球金融危机之后,为什么金融危机发源地的美国,欧债危机重灾区的欧洲各国股市连续7年走牛,屡创历史新高,唯经济最好的中国股市却连续7年熊冠全球?去年中国 2018-11-17
  • 完成自己的第一部电影, 她23岁就做到了 2018-11-17